Climping Beach → Bignor Hill pipeline

Indicative route and elevation cross-section for a hydro pipeline laid within the Rampion 2 onshore cable corridor, with an in-pipe turbine feeding the existing Bolney substation and grid connection.

Route length
31 km
Gross head
225 m
Pipe Ø
2200 mm
Grid connection
1200 MW

Plan view — route map

Route legend
Pipeline (in Rampion 2 trench)
Grid connection spur

Cross-section — sea level → reservoir

Sea level (0 m AOD)-40 m0 m50 m100 m150 m200 m250 m0 km5 km10 km15 km20 km25 km30 kmDistance from offshore intake (km) — vertical exaggeration ~25×Reservoir · 225 m AODTIn-pipe turbineGross head ≈ 225 m

Concept notes

  • Pipeline laid in the consented Rampion 2 onshore cable trench between Climping landfall and the Bolney substation area, avoiding new corridor consenting.
  • High-level reservoir on Bignor Hill (~225 m AOD) provides gross head; an in-pipe Francis or Pelton turbine sits inland of the landfall.
  • Power export reuses the Rampion 2 onshore substation and existing 400 kV grid connection — no new grid infrastructure required.
  • All coordinates, distances and elevations are indicative for visualisation only; not based on Ordnance Survey vector data.